BaronNet - Consultancy
|
Projects Page 2002/3:
|
Project Director - Petrofac International; UAE FEED for QP, Qatar to upgrade NGL 1,2,3,&4 facilities for increased throughput and new feed stocks; including two new gas pipelines; new slug catcher and a new Propane Refrigeration System. Facility upgrade included column re-trays; new and replacement reboilers, condensers & rundown coolers; additional pumps, air coolers and extensive hydraulic debottlenecking of lines and valves. Supporting works included Risk and Environmental; Control Systems extensions and extensive site works including detailed surveys. Proposal Director Epic tender for new grassroots refinery at Sohar in Oman; responsible
for complete tender and supporting development engineering, cost &
schedule and representation at JV co-ordination. Lead design improvement
studies. |
Projects Page 2001:
|
Independent Engineer Reviewing process facilities of the Shell Sakhalin Development - offshore production; onshore receiving and processing terminal; pipelines; pumping & compression stations; LNG production facility; export terminal - LNG and Oil (Ongoing) Independent Engineer PEER review of new heavy oil field in early concept development in East Africa (Ongoing) Independent Consultant - Technical Advisor Advisor to the Contract Close Out Team of the subsea and topsides facilities of the Mossgas Bredasthorp development, offshore Mossel Bay, South Africa (Complete) |
Projects Page pre-2001: Entire work history up to 2001